About
Marion Hill Associates is a marine surveyor serving New Brighton, PA. Services include condition surveys and damage assessment. Contact them directly to discuss scope, access and mobilisation.
Hours
| Monday | 7AM-5PM |
|---|---|
| Tuesday | 7AM-5PM |
| Wednesday | 7AM-5PM |
| Thursday | 7AM-5PM |
| Friday | 7AM-5PM |
| Saturday | Closed |
| Sunday | Closed |
Frequently Asked Questions — New Brighton, PA
Do you cover my area, and why do some bids include a big travel charge?
Surveyors in this industry typically work out of a home port and will travel to New Brighton, PA or nearby for a survey. That travel is priced as a separate mobilisation charge covering crew transport, equipment setup, and dive-spread logistics. It is the single line item that most often explains a large gap between otherwise similar bids.
How is the price for a condition or damage survey calculated?
Commercial diving work is quoted as a crew or spread day rate plus a separate mobilisation charge. Depending on the asset, the inspection itself is often priced per structure or per substructure unit, while marine construction jobs are usually unit-priced per linear foot or per pile. The total scope, not an hourly rate, drives the final quote.
Can you inspect without hauling out or dry-docking?
Yes, many conditions and damage surveys can be done in-water by commercial divers, which is often required for US Coast Guard in-water hull exams under 46 CFR 71.50-3. In-water work is a regulated commercial dive operation under OSHA 29 CFR 1910 Subpart T, so you can expect a full dive team. However, certain components—like props, shafts, or hull plating needing thickness gauging—may still require haul-out for a complete assessment, and your surveyor will tell you when that is necessary.
What does the final report look like, and what will it include?
You will receive a written report with condition or damage findings, photographs, and clear recommendations. It will reference the applicable standards, such as NBIS under 23 CFR 650.311 for a bridge or AWWA M42 for a water tank, depending on the asset. Turnaround time depends on the complexity, but the goal is to give you a document you can use for insurance claims, regulatory compliance, or maintenance planning.
Reviews
No reviews yetLocation & Contact
Location
Contact
Marion Hill Associates